UTS
Ltd offers a cost effective method of carrying out pipe maintenance
or line modification without shutdown of plant process. The process
involves the use of liquid nitrogen and solid freeze plugs, and
minimises draindown, refill and system downtime. The procedure can
often be instigated without any system downtime whatsoever, which
minimises the loss of expensive process fluids.
Upon completion of work the plugs are thawed and the line is then
fully operational. The plugs themselves range in size from
½" to 48" (13mm to 1,220mm) OD. |
 |

|
Pipe
Freezing applications include:
Valve Replacement
System Maintenance
Modifications
Pressure Testing
Fire System Integrity
Pipe
freezing can be performed in most locations, including:
Chemical & Petrochemical Plants
Fossil Fuel Power Plants
Nuclear Power Plants
Hospitals & Institutions
Industrial & Commercial Production Facilities
Telecommunications Industry
Water & Sewage Treatment
Malls & Shopping Centres
Hotels & Apartment Complexes
Paper Mills
Office Buildings
Fire Protection Systems
Refineries
Schools
|